2018 APEX Pro –  NASA Contingency Program

Compliance Form
Redeem
Program Details

Payout Schedule

“Hard Charger Award”
7 or more starters 50% Discount on the APEX Pro Unit + Free Base Plate and Suction Mount

Series Eligibility

 Performance Touring, Super Touring

APEX Pro Program Details

Contact

Andrew Rains
Marketing Director
(205) 419-7456

How to Claim APEX Pro Contingency? 

  1. Follow all program requirements outlined below.
  2. Complete Contingency Compliance Form at the track.
  3. Complete APEX Pro Contingency Claim Form once the official results have been published.

Usage Requirements

  1. Decals Requirement: YES
  2. # of Decals: 2
  3. Location: One decal must be used on each side of the vehicle.
  4. Decal availability: Decals are available at the driver’s information table.

Award Details

  1. Product awards are presented to the “Hard Charger” meeting the starting requirements outlined above.
  2. Awards are presented in the form of a certificate for the purchase of products.

Additional Information

  • Competitors are required to electronically complete a claim form at prizes.drivenasa.com and submit official timing results along with a picture of their vehicle showing the required decals.
  • “Hard Charger” is defined as a driver who advances the most positions in his or her respective class in the Championship Race.
  • Competitor MUST submit a photo of the Starting Grid for his or her respective class
  • Contingency awards will be awarded for the Championship race only. Qualifying races are not eligible for awards through this program.
  • Maximum of one (1) award per Championship race weekend and per car may be claimed
  • Contingency awards are non-transferable and are redeemable for qualified products only.
  • Awards will strictly be based on official race results supplied by NASA.
  • APEX Pro retains the right to change the program details at any time during 2018.
  • This optional contingency program is verified by NASA and paid for by APEX Pro.
  • Awards must be claimed within 60 days of event conclusion.
2018-08-10T09:19:07+00:00